Cisco网络技术论坛
  注册账号 论坛帮助 会员列表 日历事件

返回   Cisco网络技术论坛 > 综合区 > 其他计算机类认证考试
用户名
密码

发表新主题 回复
 
主题工具 收藏此页到新浪ViVi
天涯123
注册用户
 
注册日期: Nov 2009
住址: 江苏
帖子: 198 天涯123 向着好的方向发展
【分享】 再发 IBM 000-100,不是最新的你找我

IBM testpassport 题库 000-100
最近testpassport.cn刚刚更新的题库,现在跟大家分享下,大家看了要顶啊,谢谢了!
认证编号: EnterprISE TECHNICAL SUPPORT FOR Aix AND LINUX
考题数量: 53 Q&As
更新: Jan-15-2010
1. A customer has 2 VIO servers, supporting 4 client partitions. They want to configure Shared Ethernet
Adapter Failover.
What is the minimum number of physical Ethernet adapters required for each VIO server?
A.1
B.2
C.4
D.8
ANSWER: A
2. What is the minimum requirement to update the managed system's firmware from the HMC if inventory
scout is already installed?
A.A public internet connection
B.All logical partitions must be active
C.One partition must be configured with Service Authority
D.A local repository must be configured prior to the update
ANSWER: C
3. A customer wants to use Live Application Mobility which comes as part of the Workload Partition
virtualization offering. Which of the following is the minimum configuration that will satisfy the customer
requirement?
A.AIX 6.1 with POWER6
B.AIX 6.1 with POWER4
C.AIX 5.3 with POWER5
D.AIX 5.3 with POWER4
ANSWER: B
4. A customer wishes to use Live Partition Mobility for system maintenance. What is the minimum
requirement?
A.PowerHA
B.Virtual I/O server 1.4
C.AIX Enterprise Edition
D.PowerVM Standard Edition
ANSWER: C
5. A customer is planning to use Live Partition Mobility on a new Power 570. Which of the following must
be considered when pre-configuring the system in the IBM System Planning Tool (SPT)?
A.VIO-server setup is unsupported in SPT
B.Live Partition Mobility is unsupported in SPT
C.IVE setup is unsupported when using Live Partition Mobility
D.VIO-server setup is unsupported when using Live Partition Mobility
The safer , easier way to help you pass any IT exams.
3 / 3
ANSWER: C
6. The Integrated Virtualization Manager is packaged with which of the following?
A.PowerVM
B.Virtual I/O Server
C.Partition Load Manager
D.Virtual Workload Manager
ANSWER: B
7. What is required to collect data for analysis by the Workload Estimator (WLE)?
A.WLE LPP
B.WLE servlet
C.bos.wle.rte fileset
D.AIX 5.3 TL3 or later
ANSWER: D
8. A customer has multiple POWER5 systems connected to one HMC at version 6. They have ordered a
new POWER6 system. What is necessary in order to get the new POWER6 system managed by an HMC?
A.The old HMC can be used without change.
B.The old HMC must be upgraded to the latest level.
C.POWER6 and POWER5 must be connected to different HMCs.
D.The POWER6 system must have a separate partition on the HMC.
ANSWER: B
9. A customer has purchased a 64-way Power 595. What must be considered when planning the physical
location?
A.A Power 595 requires three-phase electricity on its own UPS.
B.A Power 595 must be placed on a concrete floor due to its weight.
C.A Power 595 must be placed on a raised floor because of the cooling requirement.
D.A Power 595 requires 1 meter of clear space on all sides for maintenance and airflow.
ANSWER: C
10. A customer has a VIOS environment configured on a Power 570 server. There are two LPARs with
application servers and three with Oracle databases. Data disks are located on EMC Symmetrix boxes
attached via SVC. Which driver should be used for disks on VIO servers?
A.SVCD
B.RDAC
C.SDDPCM
D.PowerPath
ANSWER: C版面有限,就发这么多,要完整的可以去www.testpassport.cn 去看看,或者留下你的邮箱。
旧 2010-03-18, 09:23 #1
回复时引用此帖
天涯123 当前离线   资料 悄悄话 搜索 好友
天涯123
注册用户
 
注册日期: Nov 2009
住址: 江苏
帖子: 198 天涯123 向着好的方向发展
心都寒了

现在人的素质怎么这么差啊,看帖都不回,不会让你们白回的啊,要完整版的就留下你们的邮箱
旧 2010-03-18, 11:51 #2
回复时引用此帖
天涯123 当前离线   资料 悄悄话 搜索 好友
发表新主题 回复


主题工具

发帖规则
不可以发表新主题
不可以发表回复
不可以上传附件
不可以编辑自己的帖子

启用 BB 代码
论坛启用 表情符号
论坛启用 [IMG] 代码
论坛禁用 HTML 代码

论坛跳转



所有时间均为北京时间。现在的时间是 01:14

Powered by vBulletin® 版本 3.8.3
版权所有 ©2000 - 2010,Jelsoft Enterprises Ltd.
增强包 [3.4] 制作: PHP源动力   官方中文站: vBulletin 中文
Copyright © 2003 - 2010 Net130.com, All Rights Reserved 备案号:皖ICP备05008936